_GOTOBOTTOM
Campaigns
Want to be part of a group build? This is where to start, plan, and meet about them.
Community Build 5th Session Voting Full Build
Gunny
Visit this Community
Pennsylvania, United States
Joined: July 13, 2004
KitMaker: 6,705 posts
Model Shipwrights: 4,704 posts
Posted: Monday, November 03, 2008 - 10:22 PM UTC
5 points to Peter Fulgoney (Peter F)
Peter, very nice work on the base and work with the brass barrels.

3 points to Dade W. Bell (Karybdis)
Beautiful work on the details of the flight deck and the hull. Do you leave the tape on the kit as your weld seam?

1 point to Jacob Walker (redneck)
Nice steady work and a very nice start to the photo etch upgrade.

Kenny
_________________________________________________________

The gold, 5 points to Peter Fulgoney (Peter F), progress continues on fine detailing of the vessel, and basework as well...bravo, mate!

The silver, 3 points to Dade W. Bell (Karybdis}, Dade, your build is beginning to come together, and with the previous work that you've done on the deckwork, along with the plastic, she will be a beauty!

The bronze, 1 point to Jacob Walker (redneck) for displaying progress and perserverance, as always...hope you have enough PE doors, mate!

Great job gentlemen, thanks for the experience!
~Gunny
_________________________________________________________

5 points to Peter Fulgoney (Peter F)
Fantastic work on the base, great lessons throughout the build. The PVA for the blast bags is brilliant!, The barrels look good and true and the cotton for the rough water is understated but effective.

3 points to Dade W. Bell (Karybdis)
Great deal of work on the PE deck and tubs. What impresses me are the photos showing the PE deck on the hull supports. Very clean and true workmanship.

1 point to Jacob Walker (Redneck)
Good work on the hull structure, the PE doors look good.

Honourable mention to Guido, good masking on the deck, look forward to November's postings.

Frank
_________________________________________________________

5 points Peter – Another very good job. The bow wake is fantastic as was the work on the barrels.

3 points Dade – The flight deck is looking fantastic. The surgery and combination is top notch! Then the hull work as well, nice again!

1 point Jacob – Very nice work. The doors are a very nice touch to add. Nice to see you slugging away!

Jim A.
_________________________________________________________

5 points to Peter Fulgoney's 1/700 Georgios Averoff
Again, another excellent step by step example with a hard to achieve situation (making all brass barrels leveled). The sea base is also another great example of master works.

3 poinst to Dade Bell's 1/700 IJN CV Hiryu
Dade continuously shows us that infinite PE parts can be glued perfectly. A very clean built so far!

1 point to Guido Hopp's 1/350 DKM Leipzig
Guido although not with the usual by update, has produced a good and difficult part of the built: painting decks and masked areas, with the bonus of the step-by-step instructions for the crew to enjoy.

If allowed, I also would like to mention Jacob Walker's 1/350 USS Gettysburg and his progress this month, with the always difficult task of working with PE!

Keep up!
Rui
 _GOTOTOP