Sorry for the delay folks, here are the voting results for the 10th month...
5 pts to Peter Fulgoney's 1/700 Georgios Averoff
Excellent work on the life boats Peter! The amount of fine intricate detail continues to amaze me. Well done!!
3 pts to Barry Lesht's 1/350 USS Ellyson
Great amount of work this month, she's really looking good!
1 pt to Dade Bell's 700th Hiryu
Great work (and save!) on the deck, the paint is really beginning to look great!
Honourable mention to Guido Hopp's, 1/400 Leipzig 
Continued excellence with the base work, well done Guido and I hope to see this master piece completed when real life issues are dealt with.
Frank
-------------------
5 points to Peter Fulgoney (Peter F)
Peter, great work on the small details.
3 points to Barry Lesht (DrDull)
Barry, nice work this month, especially the depth charges.
1 point to Dade Bell (Karybdis)
Dade, great work on more tiny details and nice recovery on the decal.
Kenny
-------------
5 Points - Barry - Those depth charges look great. Overall the ship is really coming to life.
3 Points - Peter - Anotehr great month on the small things.
1 point - Dade - More great work on the details and very nice fix on the flight deck.
Jim
--------------
5 points to Peter Fulgoney's 1/700 Georgios Averoff
Peter managed to make a apparently simple feature of the Averoff with success. Again, planning is the word. With the built finished in time for this voting, I am anticipating the rigging phase.
Congratulations Peter   
3 points to Barry Lesht's 1/350 USS Ellyson
Barry made the right decision on replacing the depth charges racks and throwers. These small but intricate parts will enhance the ship looks a lot. Also good solution to the making of the depth charges. Good decal application too. All subassemblies are crying to be fit together - keep up!
Congratulations Barry   
1 poinst to Dade W. Bell's 1/700 IJN Hiryu
Dade showed us that careful planning, good painting and decal application can turn sour in an instant, due to external events (feline ones!). Good actions taken, showing the level of skills Dade has. IMHO the end result after the saving operation turned out better than the initial situation. The model starts to look very good. Need to see that flight deck weathered. 
Congratulations Dade   
I also would like to give my Best Wishes to Guido - may this situation be a short term one! Cheer up and keep on "fighting"!
Modeling can wait and I am sure the Leipzig will be a show stopper once finished. 
Rui
--------------
Better late than never...
5 points to Peter Fulgoney (Peter F)
3 points to Barry Lesht (DrDull)
1 point to Dade Bell (Karybdis)
Great work mates, keep it up!
~Gunny
You are viewing the archived version of the site.
Go to modelshipwrights.com for the current dynamic site!
Go to modelshipwrights.com for the current dynamic site!
Campaigns
Want to be part of a group build? This is where to start, plan, and meet about them.
Want to be part of a group build? This is where to start, plan, and meet about them.
Hosted by Jim Starkweather
Community Build 10th session votes full build

Clanky44

Joined: September 15, 2005
KitMaker: 1,901 posts
Model Shipwrights: 934 posts

Posted: Tuesday, April 14, 2009 - 11:49 AM UTC
|  | 

















