_GOTOBOTTOM
New Content
Announcements on new content additions to the site.
MSW Scuttlebutt
04/19/11
#027
Visit this Community
Louisiana, United States
Joined: April 13, 2005
KitMaker: 5,422 posts
Model Shipwrights: 5,079 posts
Posted: Tuesday, April 19, 2011 - 01:46 AM UTC


Welcome to MSW’s Scuttlebutt! Here’s the news for the day.



On Display – IJN Fuso - In Port

MSW Crewmember Alec Cap (bigal07) takes us along as the IJN Fuso makes a port visit.




French Helo Joins CANTERBURY on Pacific Mission
Source: New Zealand Defence Force

HMNZS Canterbury has embarked a French Army of New Caledonia (FANC) PUMA helicopter and personnel while anchored in Noumea as the US-led exercise Pacific Partnership gets underway.

The French Army of New Caledonia (FANC) will work closely with NZ Defence Force personnel and those from a number of nations as part of Pacific Partnership, a dedicated humanitarian aid and disaster relief exercise throughout the Pacific which will increase interoperability and deliver medical, dental, veterinary and engineering services.

Brigadier Tramond, Joint Commodore of New Caledonia Defence Force, adds, “We have a good connection with the Kiwis and are accustomed to working together. We have an excellent relationship on both an operational level and on a personal level.”

Commanding Officer of HMNZS Canterbury, Commander Jim Gilmour, says the PUMA is crucial to the exercise and means that supplies can be speedily delivered ashore. The first time a PUMA was uploaded to the ship was for the disaster relief exercise, Tropic Twilight, last year and now FANC will join NZ Defence personnel in the exercise by using HMNZS Canterbury as a base for humanitarian activities.

FANC PUMA pilot, Captain Youri Sicard, notes that the capabilities of the PUMA are well suited to exercises like Pacific Partnership. “The PUMA can transfer up to twelve personnel per trip and can carry up to two tonnes of material ashore.”

The French Air Force currently operates a fleet of 874 active aircraft including; fighters, transport aircraft, passenger transport and helicopters. The air mobility force includes 80 helicopters like the PUMA.

Noumea is the first stop for HMNZS Canterbury before heading to the small island of Niuatoputonga in the island nation of Tonga.


This is the first time the NZ Defence Force has been involved in Pacific Partnership on such a large scale, with the participation of HMNZS Canterbury, her ship’s company and up to 150 NZ Defence personnel.

Other nations and personnel participating in this year’s exercise include a mix of about 600 military, interagency and non-governmental organisational medical professionals and engineers hailing from the US, Australia, Canada, France, Singapore and Spain.

New Zealand’s contribution to Pacific Partnership will focus on the nations of Tonga and Vanuatu, with the Ministry of Foreign Affairs and Trade supporting the development work with approximately $500,000 of funding from the New Zealand Aid Programme.


Call for Budget to Fund Next Sub Design
Source: Australian Strategic Policy Institute

Funds must be allocated in the May budget for early design work on Australia's next submarine if a serious capability gap is to be avoided, Defence experts have said. Time is running out if new submarines are to be in operation by 2025 the date proposed in the latest Defence Capability Plan update.

That plan and the 2009 Defence White Paper calls for the construction of 12 new submarines at a cost of at least $36 billion. They would replace the six Collins class submarines currently in service.

Experts from the Australian Strategic Policy Institute have said that given this will be Australia's most expensive ever weapons program and a similar spend to the National Broadband Network pressure from the Government and voters for sound planning and effective delivery would be intense.

Defence insiders have already said, off-the-record, the Navy is dreaming if it expects the Government to sign off on the 12-boat plan this year.

Mark Thomson, the director of budget and maintenance at the Australian Strategic Policy Institute, said the Government needed to use the budget to get the project moving.

A failure to do so would likely result in the existing boats reaching the end of their effective lives before their replacements were ready to put to sea.

This had happened in the transition from the old Oberon class boats to the Collins class between 1992 and 2003.

While Defence had started winding back the use of the outdated O-boats in the early 1990s, the Collins class boats were not fully operational until 2003.

Andrew Davies, ASPI's operations and capability director, said this created a decade-long capability gap that had seen many experienced submariners lost to the fleet.

The Collins class boats have been plagued by crew shortages ever since.

Mr Thomson, who worked with Mr Davies on a discussion paper on the submarine replacement issue that was released late yesterday, said the Government was due to make a ''first pass decision on the shape and size of the next submarine fleet in the next two years''.

Once that was done, the initial design work expected to cost between $500 million and $1 billion could begin.

The problem is that at the moment Defence does not have the information it needs to make informed recommendations to Government he said.

Mr Davies agrees. ''You need to understand the true costs and benefits if you are to do an informed cost benefit analysis,'' Mr Davies said. He said Defence had a history of playing down costs while playing up benefits.

At this point, despite the White Paper recommendations, the only certainties surrounding the next generation of submarines is that they will be conventionally powered and they will be built in Adelaide.

Political factors have at least partly driven those parameters.

The size of the boats, the numbers to be built and the tasks they should be required to perform are yet to be determined, Mr Davies said.

He described the White Paper recommendation as an ''ambit claim'' and questioned the need for the submarines to be able to deploy special forces units.

Mr Davies said it was difficult to conceive of a circumstance under which the need to land a small group of men on a beach would justify placing a $3 billion submarine at risk. Meanwhile, others haven't given up the fight for the nuclear option. Graham Harris, the president of The Navy League, has called for nuclear power to remain under consideration.




Frederica naval action 1778

Today marks the anniversary of the Frederica naval action 1778.




The Columbus Foundation

Today’s website is The Columbus Foundation. Enjoy.


This Day in U.S. Naval History

1783 - George Washington proclaims the end of hostilities with Great Britain.
1861 - President Lincoln orders the blockade of Southern ports from South Carolina to Texas.
1955 - USS Albany (CG 10) and USS William Wood (DD 715) begin to provide disaster relief to citizens of Volos, Greece.


Diorama Idea of the Day



Sailors bring out the ready-jet barricade, simulating an emergency landing of aircraft aboard USS Enterprise (CVN 65). To see the original high resolution photo, click here.

Gator
 _GOTOTOP