You are viewing the archived version of the site.
Go to modelshipwrights.com for the current dynamic site!
Go to modelshipwrights.com for the current dynamic site!
1⁄35Building the Oktabriskaya Revolutsia
1
Comment
 
The upper tapered bridge tower from the kit was very good and was used but supplemented with various small styrene additions. I needed to make a correctly shaped upper platform, the thereof 'wall' was made of thin brass ( PE scrap), the wall being painted on the inside first, then the deck was made by infilling the hole with white glue.
 
When dry it becomes transparent , so therefore the underside of the 'floor' was painted, hence giving a perfect colour demarcation twixt deck and wall. The under platform braces were made using triangular pieces of paper
Paper was again used for the end of platform/funnel joint sheeting, this required a few tries to get right, the photo shows the first (undersized!) template.
 
Paper was used again for the 'false wall' alongside the lower conning tower, with the stair aperture within. The funnel base inspection hatches were made of brass PE scrap, these were removed and re-applied after I had seen this photo!!
 
Comments
Another one of my JB favourites, always a treat to study this build.
Peter F
AUG 06, 2007 - 07:56 PM
Copyright ©2021 by Jim Baumann. _OPINIONS Model Shipwrights, KitMaker Network, or Silver Star Enterrpises. Images also by copyright holder unless otherwise noted. Opinions expressed are those of the author(s) and not necessarily those of Model Shipwrights. All rights reserved. Originally published on: 2007-07-20 00:00:00. Unique Reads: 7686

















