Building The Fujimi 1/350 IJN Kongo, Part 2

Part 14: 5" And 6" Guns…

The barrels of the twin 5" guns were removed and replaced with brass pieces by the always dependable Fukuya Works. The top picture shows a comparison between plastic and brass. The bottom are all six guns.

This picture depicts replacing the short, solid, 6" guns with the Fukuya barrels for a huge improvement. The first picture shows the gun base/ blast bag with the mounting hole drilled in, then a comparison shot of replacement with original, and finally, the whole arsenal before paint.

Part 15: Final Assembly…

First up, we have the port side installation of 5" AA, launch and whaler. The rear aspect of the bridge superstructure with yard arms is now attached also. The boat crane is now installed.

Moving back, we can see a couple of the boats, the airplane carts, catapult, and planes. The turrets are now also permanently installed.

Next is the spare rudder. Some quick points about this. The spare rudder had a different, darker wood than the decks. Also, considering its location, it was harder to clean than the deck, so it would naturally age a little more. Combined with the fact that it's slightly in shadow here, this is why there is a difference between this wood and the deck wood. The difference is less under optimal lighting and this will be seen in the final presentation photos.

The spare rudder wood was painted and washed in Vallejo paints.

Here is a closer shot of the Pete and catapult. The catapult's cable has been rigged as on the real thing.

Going over to the starboard side, we see two more boats. That hole next to the triple 25 will get a scratch built vent put in. An empty plane cart can be seen here.

Moving forward, we see the starboard 5" guns, launch and whaler.

The basic washes are done. The 6" guns have been attached, as have the side hanging boats. The crane for the planes is attached. The sealing dull coat for the washes has been applied. This was followed by Kristal Klear to create the windows. Searchlight lenses installed. The DF antenna was attached, then the main top and finally the radar.

The starboard accommodation stairs on the sides came apart after bending the steps up to be horizontal an then bending the stair sides. This shot was taken after positioning the steps back into shape before gluing the side on...

Because of the fragile nature of those pieces, I left the steps alone on the port side and didn't bend them into position. Being that they're vertical instead of horizontal, they don't look perfect, but at least they didn't come apart. In so many cases, Fujimi's PE is often too thin, comes apart easily during/ after bending, and doesn't have solid bend points.

Canvas covers go around the accommodation stairs gantry sides and tops. I made these out of receipt paper because that paper is thin, but strong, and works better than tissue paper. It was glued on with white glue. The actual stairs are lowered by cable attached to a davit. Because Fujimi doesn't give you these specific davits in plastic or PE, I improvised by using PE part B-17 on each side for the stairs davits, and had used the plastic parts where the other PE davits would normally go. This was then rigged with cable just as the real one would.

This picture shows the finished accommodation stairs and aft plank attached. The canvas will receive weathering as part of the final step with the clean canvas dirtied-up some.

About the Author

About Dade W. Bell (Karybdis)
FROM: MARYLAND, UNITED STATES

I'm a third generation modeler who builds a little of everything (mostly Japanese)- all while being a 45 year old hermit who lives a happy, simple life, with my fiancée (author Jaclyn Dolamore) and three cats. My father was an MM3 aboard the USS Saratoga (CVA-60), my grandfather was in one of the...


Comments

Howdy Mark, thanks a ton for getting this whole project started up and allowing me to do it and Jim to set it up. A great team effort all around and it's been a blast working with you guys!
MAY 31, 2009 - 06:12 PM
VERY well done. The article is excellent, demonstrating and illustrating and telling us the good and bad, and the finished product is a real beauty. Lovely detail, very impressive. A beautiful build.
JUN 24, 2009 - 10:09 PM
So Dade, what is next on the workbech. HOw about an Alabama or a Hood? I'm thinking about pulling one of them out when I finish the Panther I'm working on. That way I can follow right behind you again. Oh I just got in a couple of sets of those Lionroar japanese railings. Cheap look really good, and they have a nice bottom attachment rail.. Those railings on the Kongo gave me fits. By the time I had cut them off the sheet and tried to attach them they were slightly managaled and never looked quite right up close. Yours of course looked flawless.
JUN 26, 2009 - 07:51 AM
very well done, very informative, just a great build and a great article! Thanks again for taking the time to document the build in such detail cheers !
JUN 28, 2009 - 12:28 PM
Thanks again guys! I'm sorry to have been such a stranger lately-- I just promised myself that I would not start any new projects until I get some of the 1/2 and 3/4 finished projects I have haunting me out of the way. Some figures, armor, sci-fi, railroad... Steve, my next big project is the 1/350 Space Battleship Yamato (build log will be in Model Geek) followed by a rather nice wood plank on frame sailing project in 1/64 (build log will be posted here). Also in there will be my pre-dread and gator navy campaign pieces...
JUN 28, 2009 - 08:33 PM
Dade, I´ve said it many times in your online build log: Magnificent work! You have put tremendous work not only into building the kit but also into describing the obstacles. On top, you provided really nice and easy to follow solutions with brilliant photo evidence. Outstanding summery about your build of the IJN Kôngo which will save many modelers life. Congratulations!
JUL 02, 2009 - 09:31 PM
Really looking forward to that Space Battleship Yamato build
JUL 04, 2009 - 07:04 AM
Hi guys, thanks again! I promise to one day have up another big build log. I got two pesky projects out of the way last night and am moving on to some others, so the gap is narrowing before I plunge in again. Dan, I'll put a post in here linking to the Yamato build once I get it under way.
JUL 04, 2009 - 08:42 PM
Extraordinary work!
FEB 19, 2013 - 09:45 AM
Thanks Fred!
FEB 19, 2013 - 11:21 AM